Final Project COMP 1029
Final Project
COMP 1029
With Windows 7 end of support on January 14, 2020, upgrading from Windows 7 to Windows 10 is quickly becoming an urgent matter. Microsoft top issuing security patches for Windows7 and upgrading becomes a matter of security for your business-critical systems and sensitive data.
The most important thing to remember is that the Windows 7 to Windows 10 upgrade could wipe your settings and apps. There is an option to keep your files and personal data, but because of differences between Windows 10 and Windows 7, it is not always possible to keep all your existing apps. Make sure you have noted what apps you use regularly so you can easily obtain them by downloading the installers again.
There is a company name ABC who is migrating to the new location and wants to update all their windows 7 to windows 10 so they will not face any security patches problem in the future. The company hires to convert all their windows 7 system to windows 10 system.
Please make sure there are different versions of the windows e.g., windows 10 and windows pro. As per the company’s requirement use the accurate windows version which can add into the domain later on as well.
1. You need to make sure that what are the hardware requirements of the system?
2. What are the steps and methods which needs to be followed to back up the data?
3. Add screenshots of your findings with date and time visible.
4. Company needs windows 10 pro. To add it to the domains and to verify the licenses.
Suggestion: Make sure that you disable/uninstall the antivirus software’s.
Report Format
Title Page
Executive Summary
About Your Company/Company Profile
Problem Statement
Introduction
Chapter 1: Hardware Requirements (To Convert Win 7 to Win 10)- In detail
Chapter 2: What are the steps and methods which needs to be followed to back up the data
Chapter 3: Results and Analysis: Add screenshots of your findings with date and time visible
Chapter 4: How can Company assign licenses to all users? Results and Findings
SWOT Analysis of your proposed Idea
Deadlines to complete project (GANTT chart)
Budget Allocation
Conclusion