ENGG961: Systems Reliability Engineering Assignment 3: Reliability Modelling for Repairable System

Subject: ENGG961: Systems Reliability Engineering Assignment 3: Reliability Modelling for Repairable System
Purpose:
To learn knowledge and approaches for reliability modelling of repairable systems, design for
maintainability, and availability.
Learning objectives covered:
1. Understand and apply reliability concepts and terminology.
3. Understand and make use of the relationships amongst the different reliability functions.
4. Collect and analyse reliability data (times to failure and times to repair) using empirical and parametric methods (exponential, Weibull, normal and lognormal are in syllabus); collect and analyse failure times of repairable systems to determine the intensity function (power law model only in-syllabus).
8. Analyse maintainability, logistic support and the costs of reliability.
9. Understand design techniques to achieve high reliability and analyse these for optimal reliability.
10. Have a working knowledge of human factors in reliability and be able to apply prediction models.
Learning Guides
In order to complete the assignment tasks, you need to read Chapter 9, 10 and 11. While you are reading, you need to understand or answer the following questions:
1) Understand system maintainability: What is MTTR, MTBF, MPMT, MTR, MDT, SDT, MTBM?
2) What is availability? How to calculate availability?
3) How to calculate MTTR given a repair time distribution?
4) What is renewal process, Homogeneous Poisson process, superimposed renewal process?
5) What is minimal repair process? What is Nonhomogeneous Poisson process? What is power law process?
6) Understand intensity functions. Be familiar with Table 9.1 on page 233 in the textbook.
7) Understand system repair time, cycle time.
8) Have a good understanding of reliability under preventive maintenance (Figure 9.3 and Figure 9.4).
9) Know the approach of applying Markov model to repairable systems (pages 241 to 246).
10) Know maintenance concepts and procedures (Figure 10.2).
11) Understand cost model: Repair versus replacement.
12) What is the difference between preventive maintenance and predictive maintenance?
13) Understand maintainability prediction and demonstration.

Tasks
1. A machine has a time-to-first-failure distribution that is Weibull with ß = 2.15 and 0 = 600 operating hours. Assume an average usage of the machine of 100 hours per year. (30 marks)
. (a) The manufacturer of the machine offers a 10-year warranty if the customer purchases their 10- year service plan. The service plan will replace all worn parts each year, thus restoring the machine to “as-good-as-new” condition. Compare the machine reliability at 10 years
with and without the service plan. (7 marks)
. (b) The repair time distribution of the machine is lognormal with a shape parameter of 0.60 and a median repair time of 6 hours. The service centre advertises that if you bring them a broken machine, it will be repaired by the following workday. Find the MTTR and the
percent of repairs that are completed within an 8-hour workday. (8 marks)
. (c) Failure of a broken machine results in minimal repair that can be described by the
following intensity function (a nonhomogeneous process): Q(t) = 6.0 x 10-6 t1.15 with t measured in operating hours. Assume that the customer does not accept the service plan in (a).
. (i) What is the expected number of failures that will occur over 10 years? (5 marks)
. (ii) What is probability of at least one failure during the tenth year? (5 marks)
. (iii) What is the MTBF (instantaneous) at the end of the 10th year? (5 marks)
2. An essential part of a manufacturing process is the factory assemble and integration linking (FAIL) system. Unfortunately this system has experienced numerous failures over the years under a minimal repair concept that is a nonhomogeneous Poisson process having an intensity function of Q(t) = 1.15 x 10-7 t1.20 with t measured in operating hours. The system averages 3000 operating hours a year and is currently five years old. When the system fails, the repair time is
lognormal with tmed = 6.0 hours and s = 1.23. (40 marks)
. (a) When the system was new, its manufacturer offered a 600-operating-hour warranty. What
is the system reliability during the warranty period? (5 marks)
(b) What are the expected numbers of failures through the first five years of the system?
(5 marks)
. (c) How many failures are expected in the next two year (year 6 and year 7 of the FAIL
system)? (6 marks)
. (d) When the system fails, what percentage of repairs will be completed within a single 8-hour
shift? (6 marks)
. (e) When the system fails, it takes a crew of two to repair it. If the labour rate is $50 per hour and based upon the MTTR, what is the maintenance cost of the FAIL system during its
6th year of operation? (6 marks)
. (f) If the cost of the system is $20,000, what is its optimal (minimum cost) replacement time?
(6 marks)

. (g) Management group believes that a preventive maintenance (PM) program may be cost effective. A PM consists primarily of replacing certain parts having a cost of $650 and thus restoring it to as-good-as-new condition. If it takes one technician 4 hours to do this,
what is the optimum (minimum cost) PM interval? (6 marks)
3. A company operates an equipment that is essential in the manufacture of their products. This machine has been in operation for four years (1000 operating days). In order to plan for next year’s production levels, the availability of the machine must be determined. The company works a single 8-hour shift, 300 days out of one year. Relevant failure and maintenance data collected over this period is:
Failures: Minimal repair with a power law intensity function having
a = 0.000125 and b = 1.650 with time measured in operating days
Repairs: Repair time is lognormal with tmed = 2.5 days and s = 0.70 A
Scheduled maintenance: preventive maintenance of downtime of one day every five weeks (30
operating days).
. (a) What is the mean system downtime over the first four years? (8 marks)
. (b) Based upon both schedule and unscheduled maintenance, determine the expected availability of the equipment over the coming year (i.e., the next 250 operating days). (12 marks)
. (c) If the machine costs $30,080 to replace and a failure costs $200, when should the machine
be replaced? (10 marks)

Check Price Discount

Study Notes, Research Topics & Assignment Examples: »

Why Choose our Custom Writing Services

We prioritize delivering top quality work sought by college students.

Top Research Professionals

The research experts and assignment help team consists exclusively of highly qualified graduate writers, each professional with in-depth subject matter expertise and significant experience in custom academic writing.

Discounted Pricing

Our custom writing services maintain the highest quality while remaining affordable for students. Our pricing for research papers, theses, and dissertations is not only fair considering the superior quality but also competitive with other writing services.

0% Similarity Index

We guarantee plagiarism-free, human-written content. Every product is assured to be original and not AI-generated. Our writers, tutors and editors are research experts who ensures the right formating and citation sytles are followed. To note, all the final drafts undergo rigorous plagiarism checks before delivery for submission to ensure authenticity for our valued customers.

How it works

When you decide to place an order with Dissertation Help, here is what happens:

Complete the Order Form

You will complete our order form, filling in all of the fields and giving us as much instructions detail as possible.

Assignment of Writer

We analyze your order and match it with a custom writer who has the unique qualifications for that subject, and he begins from scratch.

Order in Production and Delivered

You and your writer communicate directly during the process, and, once you receive the final draft, you either approve it or ask for revisions.

Giving us Feedback (and other options)

We want to know how your experience went. You can read other clients’ testimonials too. And among many options, you can choose a favorite writer.

Write My Paper