Analyzing And Using EVM Metrics

FRANKLIN ELECTRONICS

In October 2003 Franklin Electronics won an 18-month labor-intensive product development contract awarded by Spokane Industries. The award was a cost reimbursable contract with a cost target of $2.66 million and a fixed fee of 6.75 percent of the target. This contract would be Franklin’s first attempt at using formal project management, including a newly developed proj-ect management methodology.

Franklin had won several previous contracts from Spokane Industries, but they were all fixed-price contracts with no requirement to use formal project management with earned value reporting. The terms and conditions of this contract included the following key points:

  • • Project management (formalized) was to be used.
  • • Earned value cost schedule reporting was a requirement.
  • • The first earned value report was due at the end of the second month’s effort and monthly thereafter.
  • • There would be two technical interchange meetings, one at the end of the sixth month and another at the end of the twelfth month.

Earned value reporting was new to Franklin Electronics. In order to respond to the original request for proposal (RFP), a consultant was hired to conduct a four-hour seminar on earned value management. In attendance were the project manager who was assigned to the Spokane RFP and would manage the contract after contract award, the entire cost accounting department, and two line managers. The cost accounting group was not happy about having to learn earned value management techniques, but they reluctantly agreed in order to bid on the Spokane RFP. On previous projects with Spokane Industries, monthly interchange meetings were held. On this contract, it seemed that Spokane Industries believed that fewer interchange meeting would be necessary because the information necessary could just as easily be obtained through the earned value status reports. Spokane appeared to have tremendous faith in the ability of the earned value measurement system to provide meaningful information. In the past, Spokane had never mentioned that it was considering the possible implementation of an earned value measurement system as a requirement on all future contracts.

Franklin Electronics won the contact by being the lowest bidder. During the planning phase, a work breakdown structure was developed containing 45 work packages of which only 4 work packages would be occurring during the first four months of the project.

Franklin Electronics designed a very simple status report for the project. The table below contains the financial data provided to Spokane at the end of the third month.

Note: BCWS = PV, BCWP = EV, and ACWP = AC.

A week after sending the status report to Spokane Industries, Franklin’s project manager was asked to attend an emergency meeting requested by Spokane’s vice president for engineering, who was functioning as the project sponsor. The vice president was threatening to cancel the project because of poor performance. At the meeting, the vice president commented, “Over the past month the cost variance overrun has increased by 78 percent from $14,000 to $25,000, and the schedule variance slippage has increased by 45 percent from $31,000 to $45,000. At these rates, we are easily looking at a 500 percent cost overrun and a schedule slippage of at least one year. We cannot afford to let this project continue at this lackluster performance rate. If we cannot develop a plan to control time and cost any better than we have in the past three months, then I will just cancel the contract now, and we will find another contractor who can perform.”

QUESTIONS

  • 1. Are the vice president’s comments about cost and schedule variance correct?
  • 2. What information did the vice president fail to analyze?
  • 3. What additional information should have been included in the status report?
  • 4. Does Franklin Electronics understand earned value measurement? If not, then what went wrong?
  • 5. Does Spokane Industries understand project management?
  • 6. Does proper earned value measurement serve as a replacement for interchange meetings?
  • 7. What should the project manager from Franklin say in his defense?
Tags: , , , , , , , , , , , , , , , , , , , , , , , ,

Why choose us

You Want Quality and That’s What We Deliver

Top Skilled Writers

Our writing team is assembled through a rigorous selection process, where we handpick accomplished writers with specialized expertise in distinct subject areas and a proven track record in academic writing. Each writer brings a unique blend of knowledge and skills to the table, ensuring that our content is not only informative but also engaging and accessible to a general college student audience

Discounted Prices

Competitive pricing is a cornerstone of our service, where we balance affordability with exceptional quality. In offering the best writers at rates that rival other writing services, we ensure that students can access top-notch content without breaking the bank unnecessarily. Our fair and transparent pricing structure is designed to provide value for money, making us a go-to choice for students seeking high-quality writing services at an affordable price.

100% Plagiarism-Free

Academic integrity is paramount to our writing service, which is why we produce original research and writing content for every paper. Each piece of work is carefully written from scratch, ensuring that every sentence, paragraph, and page is authentic and free from plagiarism. Our rigorous quality control process involves thorough scanning of every final draft, guaranteeing that the content meets the highest standards of originality and academic integrity. With keen attention to citation and referencing, we ensure that every source is properly credited, giving you complete peace of mind. We also have the best plagiarism checkers like safeassign and turnitin thus providing similarity score for each paper.

How it works

When you decide to place an order with Dissertation Help, here is what happens:

Complete the Order Form

You will complete our order form, filling in all of the fields and giving us as much detail as possible.

Assignment of Writer

We analyze your order and match it with a writer who has the unique qualifications to complete it, and he begins from scratch.

Order in Production and Delivered

You and your writer communicate directly during the process, and, once you receive the final draft, you either approve it or ask for revisions.

Giving us Feedback (and other options)

We want to know how your experience went. You can read other clients’ testimonials too. And among many options, you can choose a favorite writer.